Friday, October 8, 2010

NURBgallery

Assignment: Design and construct a Gallery. Within the space design a NURB system installation.






Monday, October 4, 2010

The Hemphill Branch Library

Assignment: Research a Library in the Greensboro Library System. Anaylize through photos, 3D Models, spatial analysis, and etc.







The Phillip Exeter Academy Library

Assignment: Do a detailed precedent anaylsis on a library of your choice from the given suggestions. Include photographs, diagrams, 3D models, and etc.







Wednesday, September 29, 2010

Vertical Connection- Reading Room

Assignment: Eaach student shall identify a space in or around the Gatewood Studio Arts Building that will serve as the site for his/her design. The space shall be large enough to accomodate a space roughly 10' X 15' that will allow for at least 3-4 people. The site must have accessibility to faculty and students

Located in the Lobby of the Gatewood Studio Arts Building. The reading room connects the lobby and the 2nd floor.

Through the use of the spiral staircase, the user is able to interact with the reading room without even having to be in the actual space.

View looking into the reading or lounge area.

The highlighted blue square shows the staircases relationship to the lobby and remaining floor.


Top orthographic View


Circulation Diagram

Center City Sounds- Albermarle Downtown Revitalization Presentation








Albemarle Final Framework

The Final Presentation of the downtown revitalization of the Albermarle, NC Old Belk Building. This was a partner project. I worked with Kurt Huizenga. We worked together on the overall building design and concept. We individually worked on the residential units. I designed Residential Unit #2 and the Laundry Room. All of the perspectives were rendedered by Kurt Huizenga using Sketchup with Podium. I was responsible for all Floorplans, Data Communication Plans, and Reflected Ceiling Plans.